GCL Achievements and Projects in China Lagoons -
|
|
|||||||||||||||||||||||||||||||||||||||||||||
| Self-Repair | Cracked CCL |
![]() |
![]() |
Comparison of COMPACTED CLAY and GCLs for landfill cap applications
|
Compacted Clay |
GCLs |
|
More material required (resulting in more equipment, more noise, more dust) |
Far less material required |
|
Installation time is usually longer |
Very rapid installation |
|
Installation is extremely weather-sensitive |
Installs in a variety of weather conditions |
|
Difficult to control quality of raw materials |
Made with pure, processed bentonite |
|
Difficult to control quality of installation; rigid CQA program required |
Pre-manufactured product, rigidly controlled, much less CQA needed |
|
Hydraulic performance is severely compromised by desiccation |
Desiccation does not affect hydraulic performance |
|
Cannot withstand differential settlement without cracking |
Can undergo settlement with no impact on permeability |
|
Significant freeze/thaw effects |
Unaffected by freeze/thaw cycles |
|
Difficult to achieve necessary compaction on soft landfill surface |
No compaction required |
|
Heavy construction equipment required |
Only light equipment required |
|
Substantial liner construction experience is essential for proper performance |
Inexperienced field crews can be trained to install properly |
|
Test pad typically required |
No test pad needed |
|
Difficult to repair |
Easy to repair using patches |
|
Thickness results in increased space requirements |
Very thin and occupies little space |
|
Unpredictable costs |
Completely predictable cost |
|
Preferential flow paths likely |
No preferential flow paths possible |
|
Roots can open permanent cracks |
Swelling bentonite seals around roots |
|
If not available on site, clay soils must be delivered (resulting in excess noise, road deterioration, traffic, air pollution) |
One truckload of Bentomat is enough to cover 3,000m2. |
|
Additional water must be added during construction |
Installed dry, no additional water needed |
Use HDPE + GCLs in Landfills
The American Society of Civil Engineers declared that they have inspected 200,000m2. HDPE geomembrane used for liner and found about 26 holes would appear in each 10,000sq.m. Inspection of these holes revealed that 15%, are due to the HDPE manufacturing process and 69% holes appeared in the seam area.
The limitation of the HDPE geomembrane:
The ability of anti-aging is restricted;
Differential settlement will cause the HDPE geomembranes to crack easily or change its performance;
The installation requirements are strict and any carelessness in workmanship will cause seepage through the HDPE geomembrane;
The advantages of the GCLs:
Bentonite is a natural mineral that is not subject to deterioration due to ageing;
GCLs can undergo settlement with no impact on permeability;
Installation is very rapid and easy.
Copyright 2005 CETCO Technologies
(Suzhou) Co., Ltd.
All rights reserved. CETCO is a wholly owned subsidiary of
AMCOL International Corp.
162 Qingqiu Street, Suzhou Industrial Park, Suzhou, Jiangsu Province, China
(215021) |Tel: +86 512 6283 3806 | Fax: +86 512 6283 3807
For questions regarding this site, contact
webmaster | Legal Terms and
Conditions of Use | Privacy Policy