Featured Case Studies: Plaza Restoration

500 5th Avenue Seattle WA

Seattle, WA USA

Vapor intrusion has become a significant environmental issue for regulators, industry leaders, and concerned residents nationwide. The use of a spray-applied gas vapor barrier to protect against the threat of vapor intrusion has become a widely recognized application by numerous local and state regulatory and guidance groups.

Download Full Case Study

Mercy Hospital Plaza

St. Louis, MO, USA

To minimize building exposure, poor air quality, and odors, this occupied hospital utilized COREFLEX to waterproof the plaza deck prior to installing a GreenScapes vegetated roof system, hard-scape and water features.

Download Full Case Study

Piper Tech Parking Deck

Los Angeles, CA, USA

Download Full Case Study

Ronald McDonald House

Chicago, IL, USA

CETCO provided the complete watertight green roof assembly for the nation’s largest Ronald McDonald House. Protected by CETCO’s COREFLEX® waterproofing membrane, three GreenScapes™ assemblies—intensive, extensive, and vegetated trays—were utilized to meet a challenging landscape design.

Download Full Case Study

Rush University Hospital Atrium

Chicago, IL, USA

Rush University is one of the top-ranked nursing colleges in the US. Its hospital is comprised of 676 beds and boasts national rankings in 10 of 16 specialty areas in U.S. New & World Report’s 2011 “America’s Best Hospitals” issue.

Download Full Case Study

Sandpiper Run Plaza Restoration

Pawley's Island, SC, USA

This restoration application used an extensive GreenScapes™ system with COREFLEX® waterproofing technology to create an ocean side lawn space for condo occupants. When used in restoration applications, CoreFlex® minimizes demolition, reduces building exposure and limits building down time.

Download Full Case Study

Shady Hills Gymnasium and Parking Garage

Cambridge, MA, USA

The original spec called for ULTRASEAL below slab with a layer of VOLTEX DS installed over it to provide protection from subsequent concrete operations. However, once the dewatering of the site began, it became apparent that there would be significantly more water at a greater flow rate.

Download Full Case Study

Toronto Fire Services

Totonto, ON, Canada

Vapor intrusion has become a significant environmental issue for regulators, industry leaders, and concerned residents nationwide. The use of a spray-applied gas vapor barrier to protect against the threat of vapor intrusion has become a widely recognized application by numerous local and state regulatory and guidance groups.

Download Full Case Study

Wake Forest University Hosp. Plaza Deck Restoration

Winston-Salem, NC, USA

Restoration of the plaza deck was required for watertightness of the hospital space below and reopening of the emergency room entrance. COREFLEX was quickly installed over the leaking hot-applied rubber membrane to complete the project on time with minimal building exposure.

Download Full Case Study

Washington Univ. School of Medicine Plaza Deck Restoration

St. Louis, MO, USA

When it was decided that a courtyard would be implemented into the WUSM/BJC Medical complex, the design team understood that waterproofing and protecting the occupied space below during construction would be critical to the success of the project.

Download Full Case Study