Barrick Goldstrike Mine

Elko, Nevada

The Barrick Goldstrike tailings bottom liner system consisted of an 80 mil HDPE textured geomembrane overlaying BENTOMAT DN GCL. The GCL was used as a replacement for the 1 ft of 1 x 10-6 cm/sec permability compacted clay liner.

Download Full Case Study

Fort McMurray Oil Sands

Northeastern Alberta, Canada

The Suncor Pond 1 is an oil sands tailings pond located near Fort McMurray, Alberta, Canada. This region experiences an average winter temperature of -19 °C, with a record low temperature of -50 °C. Full-scale closure and reclamation activities had been underway at the site since 2007. In late 2009, infilling of the pond had been completed.

Download Full Case Study

Fresh Kills Landfill

Staten Island, New York

Fresh Kills landfill is one of the largest landfills in the world, comprising a total of 2,200 acres. The construction of the cap was to be completed over five construction seasons from 2006-2010.

Download Full Case Study

Plank Road Landfill

Patterson, New Jersey

Jersey Brownfield was formerly the site of a chemical recycling facility with soil at the site was heavily contaminated.

Download Full Case Study

Rasmussen Ridge Phosphate Mine

Soda Springs, Idaho

The Rasmussen Ridge Phosphate Mine Tailing Storage Facility was implemented as part of the on-going Supplemental Reclamation Action as a demonstration project. The cap and cover system was designed to effectively eliminate surface water infiltration and potential runoff of trace concentrations of selenium contained in the waste rock.